We removed shingles along eve of roof above deck and installed new drip edge and ice and water shield. We then installed new shingles and tied them into the existing ones. We replaced the missing shingles by cooler. Finally, we installed SST hangers on west gutter and installed 8″ pipe extension on furnace pipe.