We removed and hauled away shingles on lower edge of back valley and installed new standard 3 tab Owens Corning shingles in black. Then we tied into existing shingles, re-installed existing de-icing cable, and replaced the missing shingles on the upper north side of roof. Finally, we installed rain kick out at base of valley.